CLIP Intermodal Container Terminal

Last audited at
09-03-2017
CLIP Intermodal Container Terminal
Rabowicka 77,
62-020 Swarzedz
POLAND
Show map

Telephone: +48616598967
Fax: +48616598956
clip.terminal@clip-group.com
Internet: www.clip-group.com
55% Accessibility & Connectivity
76% Services
100% Safety & Security
100% Customs
50% ICT
76% Overall
Avg. CO2 level reduction
01234
Avg. CO2 emission container
10.31 kg

Date founded

15-01-2011

Parent organisation

CLIP Group

Opening hours general or Truck

Monday: 00:00 - 24:00
Tuesday: 00:00 - 24:00
Wednesday: 00:00 - 24:00
Thursday: 00:00 - 24:00
Friday: 00:00 - 24:00
Saturday: 00:00 - 24:00
Sunday: 00:00 - 24:00

Opening hours Barge

Monday: closed
Tuesday: closed
Wednesday: closed
Thursday: closed
Friday: closed
Saturday: closed
Sunday: closed

Opening hours Rail

Monday: 00:00 - 24:00
Tuesday: 00:00 - 24:00
Wednesday: 00:00 - 24:00
Thursday: 00:00 - 24:00
Friday: 00:00 - 24:00
Saturday: 00:00 - 24:00
Sunday: 00:00 - 24:00

Partnerships

    Lot size

    53430 m2


    Capacity per annum (no. of handlings)

    300000


    Quay length

    0 m


    Number of tracks at terminal

    4


    Length of rail track

    871 m


    Possibilities for expansion

    Ja


    Terminal expansion with another 4 x 750m rail tracks Installation of RTG’s in order to increase capacity further Full electrification of Western and Eastern entrance of the terminal area


    Development in surrounding area

    CLIP Group will built additional warehouses to reach a total surface of 440.000sqm


    No. of cranes

    0


    No. of reach stackers

    2


    No. of empty stackers

    1


    Mission statement

    "Implementation of the policy of decreasing the number of road transports and increasing the number of rail transports through establishing a rail hub on the E20 which in its final stadium will service the entire region of western Poland”

    Vision

    „Development of the CLIP logistics centre to 260,000 m2 of warehouses under roof, serving as, among others, a RAIL PORT for the road-rail intermodal container terminal with the handling capacity of 200,000 TEU/year”

    Development plans

    Area expansion to 100.000 m2

    From Rotterdam

    ERS Railways
    Swarzedz
    Rail
    22:00
    1x1x1x1x1x1x-

    To Rotterdam

    ERS Railways
    Swarzedz
    Rail
    22:00
    -1x1x1x1x1x1x

    Request for quotation Back to overview

    Rating details

    Criteria Rating Description Read more

    Accessibility & Connectivity

    Terminal's connections to Port of Rotterdam

    Inland shipping connection to/from Rotterdami
    0% 0
    Transit time by inland shipping
    0 hour
    Rail connection to/from Rotterdami
    86% 6
    Transit time by rail
    22 hour

    Terminal access

    Vessel classes permitted at the terminali
    0%
    Length of rail tracki
    100% 871 m
    Transport to terminal by third partiesi
    100% Yes

    Services

    Pre-transport and end-transport
    100% Yes
    Warehousei
    100% Yes, in-house external
    Transhipment dangerous goodsi
    100%
    • Class 2.1
    •  
    • Class 2.2
    •  
    • Class 2.3
    •  
    • Class 3.1
    •  
    • Class 3.2
    •  
    • Class 3.3
    •  
    • Class 4.1
    •  
    • Class 4.2
    •  
    • Class 4.3
    •  
    • Class 5.1
    •  
    • Class 5.2
    •  
    • Class 8
    •  
    • Class 9
    Storage dangerous goodsi
    100%
    • Class 2.2
    •  
    • Class 2.3
    •  
    • Class 3.1
    •  
    • Class 3.2
    •  
    • Class 3.3
    •  
    • Class 4.1
    •  
    • Class 4.2
    •  
    • Class 4.3
    •  
    • Class 5.1
    •  
    • Class 5.2
    •  
    • Class 8
    •  
    • Class 9
    Reefer connectionsi
    100% 96
    Gas measurement and forced degassingi
    0% No
    Empty depot servicesi
    100%
    • Cleaning
    •  
    • Repair
    •  
    • Pre-trip Inspection
    •  
    • Estimating
    Tank cleaningi
    0% No

    Safety & Security

    AEO securityi
    100% Yes
    Access controli
    100% Yes
    Camera surveillancei
    100% Yes
    Working safelyi
    100%
    • People
    •  
    • Equipment

    Customs

    AEO Customsi
    100% Yes
    Customs warehousei
    100%
    • Customs bonded warehouse type B internal
    Local Clearance Procedurei
    100% Yes

    ICT

    Track & trace cargo datai
    0% No
    EDI communication possiblei
    100% Yes

    Sustainability

    CO2 Footprint 2016

    Total CO2 emission

    618.413 kg

    Total number of containers

    ÷ 60.000


    CO2 emission per container

    = 10,31 kg

    Average CO2 emission participating terminals

    9,28 kg

    Measures to reduce CO2 emissions

    Level

    Reducing energy demand - Monitoring fuel usage
    01234
    i
    Reducing energy demand - Efficient equipment usage (By training/education of employees)
    01234
    i
    Reducing energy demand - Efficient operations
    01234
    i
    External orientation - Communication
    01234
    i
    External orientation - Innovation
    01234
    i
    External orientation - Supply chain collaboration
    01234
    i

    The emission factors used and explanation of the above results can be found at this page